dam up
英 [dæm ʌp]
美 [dæm ʌp]
壅高;筑坝壅水;挡水
英英释义
verb
- obstruct with, or as if with, a dam
- dam the gorges of the Yangtse River
双语例句
- Is it not the purpose of meditation to dam up the energies on the higher levels, or to push them back and up, so as to enable the higher levels to prosper also?
冥想的目的莫非将能量聚集于上层,或者将下游的能量逆推而上,好让上层得以繁荣? - In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up.
本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数; - The major contents are as follows: ( 1) According to the conservation of energy theory and the heat transfer theory, the heat transfer model of dam leakage is set up through the combination with the conservation energy equation and the heat transfer equation.
根据能量守恒原理、传热学理论,由能量平衡方程及热传导方程联合建立大坝渗漏传热模型。 - The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
基于时间序列分解法建立大坝变形预测模型。 - Dam foundation and dam construction quality come up to excellent standards and the project is elected the high-quality project.
大坝工程的基础处理及填筑施工质量达到优良水平,被水电部评为优质工程。 - Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。 - After the two solutions, in down dam selection it is also under the same technical and economic comparison of the dam with the up dam, finally the concrete arch dams is selected.
在选定这两个方案后也是通过和在上坝址选择过程一样的方法对下坝址进行了技术经济比较,最终选定下坝址以混凝土拱坝为代表坝型。 - Jack is not such a man as can dam up his feeling.
杰克不是能控制感情的人。 - The concrete seepage place of water conservancy engineering seepage is difficult to determine. We use the throwing salt method analyze the dam seepage and put up the evidence to engineering design of danger control.
水利工程渗漏一般较难准确确定具体渗漏部位.用投盐法分析大坝渗漏,可为工程除险加固设计提供依据。 - The basic conditions, which the dam system can come up to relative stability, are as follow.
坝系要达到相对稳定,最基本的条件有3个:一是相对稳定系数必须大于或等于一定的允许值,这是坝系要达到相对稳定的关键;
